Anu IntDec, Interior and Facade Contractors

Our service

Civil and Interior Fit-out

Civil jobs and interior fit-out that bring partitions, ceilings, flooring and finishes together under one responsible team.

  • Factory offices and canteens
  • Hospital wards and clinics
  • School and college blocks
  • Showrooms and banquet halls
Site workers on a building under construction

Many projects need more than one trade. A new office block in a factory, a refurbished ward, a school floor or a showroom each need civil work, partitions, ceilings, flooring, painting and finishing in the right order. We combine these under one team that plans the sequence, manages the site and answers for the result.

What we do

  • Masonry, plastering, tiling and painting.
  • Partitions in aluminium, board and glass, see aluminium fabrication.
  • False ceilings, see false ceilings.
  • Vinyl and wooden flooring, see flooring.
  • Blinds and window finishes, see blinds.
  • Facade and glazing coordination, see ACP and facade cladding and glazing.
  • Office, canteen, ward, classroom, showroom and banquet fit-out.
  • Minor alterations and openings, with structural advice where needed.
  • Site supervision, programme and a clean handover.

Why sequence matters

Fit-out goes wrong when trades arrive in the wrong order. A typical sequence on an interior fit-out is:

  1. Survey and setting out.
  2. Demolition and making good, where needed.
  3. Masonry and plastering, and waterproofing in wet areas.
  4. First-fix electrical, plumbing and air-conditioning.
  5. Partition and ceiling framing.
  6. Inspection of services before boards are closed.
  7. Boarding and jointing, then plaster and painting preparation.
  8. Floor preparation and flooring.
  9. Painting and final coats.
  10. Fittings, fixtures, blinds and cleaning.
  11. Snagging and handover.

Doing flooring before painting, or closing a ceiling before the electrician has finished, means rework. A written programme prevents it.

Planning the project

Brief. What will the space be used for, how many people, what equipment, and what must it look like? A clear brief saves weeks.

Drawings. Existing drawings (or our measured survey) are turned into a layout, a ceiling plan and a finishes schedule for your approval.

Approvals. The building owner or landlord, the fire consultant and sometimes the local authority may need to approve changes. We tell you early what is needed.

Phasing. Occupied buildings are fitted out in phases, with temporary barriers, protected routes and agreed working hours.

Procurement. Long-lead items such as glass, special boards, doors and lighting are ordered early so they arrive when needed.

How we work on site

  • A named supervisor is on site and a named contact is available to you.
  • Work areas are separated, floors and furniture are protected, and the site is cleaned daily.
  • Materials are checked on delivery and stored safely.
  • Safety rules apply to everyone: protective equipment, safe access, hot-work control and tidy storage.
  • Progress is reported against the programme, with photographs.
  • Changes are agreed in writing before they are carried out, with their effect on cost and time.

Quality checks

  • Setting-out dimensions verified before work starts.
  • Walls plumb, floors level, ceilings flat, to the tolerances agreed.
  • Concealed work (services, framing) inspected before it is closed.
  • Painted surfaces checked in good light for coverage and finish.
  • Doors, windows and fittings operated and adjusted.
  • A snag list prepared and closed before handover.

Common problems and how to avoid them

Problem Usual cause How we avoid it
Delays Late decisions, late materials, trades out of order Early approvals, long-lead items ordered first, written programme
Cost increases Scope not defined, changes made on site Itemised scope, written change approvals
Dust and complaints No separation or cleaning Barriers, daily cleaning, agreed hours
Poor finish Rushed preparation, wrong materials Preparation time in the programme, materials agreed in advance
Snags at handover No checks during the work Stage checks and a formal snag list

Care after handover

We provide a list of the finishes and materials used, advice on cleaning each surface, and a point of contact for defects. A maintenance contract keeps partitions, ceilings, flooring and glazing in good order.

What affects cost and time

Area, the number of trades, the finishes chosen, the amount of demolition and making good, the services involved, the working hours and the schedule all affect cost and time. Our guide to reading a fit-out quotation shows how to compare proposals fairly.

Planning a fit-out? Discuss your requirement with us.

Questions

Civil and fit-out: common questions

Do you handle several trades on one job?
Yes. We coordinate civil work, partitions, ceilings, flooring and finishes so that you deal with one team and one schedule. Electrical, plumbing and air-conditioning contractors can work alongside us, and we sequence their work with ours.
Can you work around our operations?
We plan phases, working hours, dust and noise control with you, especially in hospitals, schools and operating factories. A work area is separated from the rest of the building and cleaned every day.
Do you do structural changes?
Minor alterations such as openings and partition changes are part of fit-out work. Anything that affects the structure needs the building owner's approval and a qualified structural engineer's advice, and we say so at the start.
Who arranges electrical and plumbing work?
Depending on the job, we can coordinate your own electrician and plumber or bring in licensed specialists. The scope is written into the proposal so that it is clear who does what.
How do you control the schedule?
We prepare a written programme with the order of trades and key dates, update it as work proceeds, and report progress to a named contact. Delays caused by late decisions, access or other contractors are flagged early.
What happens at handover?
We walk the site with you, record any snags, close them and clean the area. We hand over a list of finishes and materials used and advise on care and maintenance.

Planning a project? Let us talk it through.

Tell us what you have in mind. We will call you, visit the site and put the scope, schedule and cost in writing.